Lowndes County, GA, Stream Monitoring and Stormwater Permit 2020-04-28 [Up]

LAKE blog posts:

Previous documents:

[IMPAIRED WATERS MONITORING AND IMPLEMENTATION PLAN]
IMPAIRED WATERS MONITORING AND IMPLEMENTATION PLAN

Documents obtained by LAKE through a Georgia Open Records Act (GORA) request specific to this topic:

Below are images of each page.

-jsq

Investigative reporting costs money, for open records requests, copying, web hosting, gasoline, and cameras, and with sufficient funds we can pay students to do further research. You can donate to LAKE today!

2017-Phase_II_SWMP

[Existing Phase II MS4 Storm Water Management Program Template]
Existing Phase II MS4 Storm Water Management Program Template
PDF

MCM-A: Public Education and Outreach on Storm Water Impacts

[A. Best Management Practice (BMP) #1: Public Education Program]
A. Best Management Practice (BMP) #1: Public Education Program
PDF

MCM-C: Illicit Discharge Detection and Elimination

[BMP #1: Outfall Map and Inventory]
BMP #1: Outfall Map and Inventory
PDF

MCM-D: Construction Site Storm Water Runoff Control

[A. Best Management Practice (BMP) #1: Legal Authority]
A. Best Management Practice (BMP) #1: Legal Authority
PDF

MCM-E: Post-Construction Storm Water Management in New Development and Redevelopment

[A. BMP #1: Legal Authority]
A. BMP #1: Legal Authority
PDF

MCM-F: Pollution Prevention/Good Housekeeping for Municipal Operations

[A. BMP #1: MS4 Control Structure Inventory and Map]
A. BMP #1: MS4 Control Structure Inventory and Map
PDF

Appendix A: Enforcement Response Plan

[NOTE: Upon completion, the ERP will be included as an Appendix to the SWMP.]
NOTE: Upon completion, the ERP will be included as an Appendix to the SWMP.
PDF

Appendix B: Impaired Waters

[4. ...the MS4 must develop an Impaired Waters Plan/Monitoring and Implementation Plan (see Part 4.4.2 of the NPDES Permit) including:]
4. ...the MS4 must develop an Impaired Waters Plan/Monitoring and Implementation Plan (see Part 4.4.2 of the NPDES Permit) including:
PDF

Phase-II-2017-final-permit

[General NPDES Stormwater Permit No. GAG610000]
General NPDES Stormwater Permit No. GAG610000
PDF

PART 4. STORMWATER MANAGEMENT PROGRAM

[to satisfy the appropriate water quality requirements of the State Act and Rules (Chapter 391-3-]
to satisfy the appropriate water quality requirements of the State Act and Rules (Chapter 391-3-
PDF

[For those permittees with a population less than 10,000 at the time of the permit]
For those permittees with a population less than 10,000 at the time of the permit
PDF

[e School presentations;]
e School presentations;
PDF

[minimum number of BMPs detailed in Part 4.2.1 and]
minimum number of BMPs detailed in Part 4.2.1 and
PDF

[minimum number of BMPs detailed in Part 4.2.2 and]
minimum number of BMPs detailed in Part 4.2.2 and
PDF

[Page 11]
Page 11
PDF

[2.b. Provide the number of outfalls added during the]
2.b. Provide the number of outfalls added during the
PDF

[stream miles walked, as well as the number of outfalls]
stream miles walked, as well as the number of outfalls
PDF

[and the total number of outfalls on the MS4 in]
and the total number of outfalls on the MS4 in
PDF

[stream miles walked as well as the number of outfalls]
stream miles walked as well as the number of outfalls
PDF

[facilities using EPD’s Industrial General Permit (IGP) Notice of Intent and]
facilities using EPD’s Industrial General Permit (IGP) Notice of Intent and
PDF

[Page 17]
Page 17
PDF

[number of site plans reviewed, approved, or denied)]
number of site plans reviewed, approved, or denied)
PDF

[necessary, modify the E&S ordinance for compliance]
necessary, modify the E&S ordinance for compliance
PDF

[Notice of Violation, Stop Work Order) and status (e.g.]
Notice of Violation, Stop Work Order) and status (e.g.
PDF

[permittees located in the 11-county coastal management program service]
permittees located in the 11-county coastal management program service
PDF

[minimum performance standards are applied during the site plan]
minimum performance standards are applied during the site plan
PDF

[For those permittees located in the 11-county coastal]
For those permittees located in the 11-county coastal
PDF

[permittees with a population exceeding 10,000 at the time of this permit]
permittees with a population exceeding 10,000 at the time of this permit
PDF

[Page 25]
Page 25
PDF

[Page 26]
Page 26
PDF

[report. The total number of executed]
report. The total number of executed
PDF

[6.a. For those permittees with a population exceeding]
6.a. For those permittees with a population exceeding
PDF

[Page 29]
Page 29
PDF

[Page 30]
Page 30
PDF

[Page 31]
Page 31
PDF

[including the total number of each type of structure (e.g.]
including the total number of each type of structure (e.g.
PDF

[as needed. Provide the number of each type of structure]
as needed. Provide the number of each type of structure
PDF

[total number of structures in cach annual report.]
total number of structures in cach annual report.
PDF

[control structures. Provide the number of each type of]
control structures. Provide the number of each type of
PDF

[Page 36]
Page 36
PDF

[escalating enforcement responses to address repeat and continuing violations. The plan]
escalating enforcement responses to address repeat and continuing violations. The plan
PDF

[population less than 10,000 at the time of permit issuance (see Appendix B) or at]
population less than 10,000 at the time of permit issuance (see Appendix B) or at
PDF

[population exceeding 10,000 at the time of permit issuance (see Appendix B) or at]
population exceeding 10,000 at the time of permit issuance (see Appendix B) or at
PDF

[and a water is removed from the 303(d) list of impaired waters, then monitoring]
and a water is removed from the 303(d) list of impaired waters, then monitoring
PDF

[Page 41]
Page 41
PDF

PART 5. MONITORING, RECORDKEEPING AND REPORTING REQUIREMENTS

[5.1 Annual Report; 5.2 Monitoring Requirements]
5.1 Annual Report; 5.2 Monitoring Requirements
PDF

PART 6. STANDARD PERMIT CONDITIONS

[demonstrate compliance with this permit, including any additional monitoring]
demonstrate compliance with this permit, including any additional monitoring
PDF

Appendix A: Definitions

[Annual Report]
Annual Report
PDF

Appendix B: Phase II MS4s by Population

[Phase II MS4s with a population greater than 10,000]
Phase II MS4s with a population greater than 10,000
PDF

2020-LC-IW-Monitoring-and-Implementation-Plan-Complete-Package-Final

[IMPAIRED WATERS MONITORING AND IMPLEMENTATION PLAN]
IMPAIRED WATERS MONITORING AND IMPLEMENTATION PLAN
PDF

ALAPAHA RIVER (R031102021203) - TWR

[Alapaha River (R031102021203) Willacoochee River 94 miles to Stateline]
Alapaha River (R031102021203) Willacoochee River 94 miles to Stateline
PDF

CAT CREEK (R0O31102030304) - DO

[1- Dissolved Oxygen: Cat Creek (R031102030304) Beatty Mill Creek near Ray City 4 miles to Withlacoochee River]
1- Dissolved Oxygen: Cat Creek (R031102030304) Beatty Mill Creek near Ray City 4 miles to Withlacoochee River
PDF

CAT CREEK (R031102030305) - DO

[]
[
PDF

FRANKS CREEK (R031102040503) - FC

[Franks Creek (R031102040503) State Route S1780 9 miles to Little River near Hahira]
Franks Creek (R031102040503) State Route S1780 9 miles to Little River near Hahira
PDF

TRIBUTARY TO FRANKS CREEK (R031102040504) - FC

[Tributary To Franks Creek (R031102040504) Pond 780 Feet Upstream of Union Rd 1 mile to Franks Creek]
Tributary To Franks Creek (R031102040504) Pond 780 Feet Upstream of Union Rd 1 mile to Franks Creek
PDF

JUMPING GULLY CREEK (R031102030903) - FC

[Jumping Gully Creek (R031102030903) Bevel Creek 1 mile to State Line]
Jumping Gully Creek (R031102030903) Bevel Creek 1 mile to State Line
PDF

Mud CREEK (R031102021102) - FC

[Mud Creek (R031102021102) Downstream Valdosta Mud Creek WWTP 9 miles to Alapahoochee River]
Mud Creek (R031102021102) Downstream Valdosta Mud Creek WWTP 9 miles to Alapahoochee River
PDF

TRIBUTARY TO WITHLACOOCHEE RIVER #2 (R031102030804) - FC

[Tributary To Withlachoochee River #2 (R031102030804) Headwaters 9 miles to Withlacoochee River]
Tributary To Withlachoochee River #2 (R031102030804) Headwaters 9 miles to Withlacoochee River
PDF

WITHLACOOCHEE RIVER (R031102030401) — FC, TWR

[Withlacoochee River (R031102030401) Bay Branch 9 miles to Little River]
Withlacoochee River (R031102030401) Bay Branch 9 miles to Little River
PDF

WITHLACOOCHEE RIVER (R031102030403) — FC, TWR

[Withlacoochee River (R031102030403) New River 23 miles to Bay Branch]
Withlacoochee River (R031102030403) New River 23 miles to Bay Branch
PDF

WITHLACOOCHEE RIVER (R031102030806) — FC, PB, TWR

[Withlacoochee River (R031102030806) Little River 15 miles Okapilco Creek]
Withlacoochee River (R031102030806) Little River 15 miles Okapilco Creek
PDF

WITHLACOOCHEE RIVER (R031102030902) - TWR

[Withlacoochee River (R0O31102030902) Withlacoochee River 14 miles to Stateline]
Withlacoochee River (R0O31102030902) Withlacoochee River 14 miles to Stateline
PDF