owl LAKE

Packet: Race Track Road SE abandonment and TXT-2024-01 ULDC Amendments @ LCC 2024-04-08 [Up]

LAKE blog post:

Documents received in response to a LAKE open records request:

Pictures

MMM

[Race Track Road SE abandonment and TXT-2024-01 ULDC Amendments @ LCC 2024-04-08]
Race Track Road SE abandonment and TXT-2024-01 ULDC Amendments @ LCC 2024-04-08

April-8-9-2024-Meeting-Packet

[PROPOSED AGENDA]
PROPOSED AGENDA
PDF

Abandonment of a Portion of Race Track Road SE

[BUDGET IMPACT: N/A They didn't say why, but apparentlly it's because of the Southern Gateway subdivision.]
BUDGET IMPACT: N/A They didn't say why, but apparentlly it's because of the Southern Gateway subdivision.
PDF

TXT-2024-01 ULDC Amendments

[BUDGET IMPACT: N/A Six amendments.]
BUDGET IMPACT: N/A Six amendments.
PDF

[RECOMMENDED ACTION: Approve DEPARTMENT: Planning/Zoning DEPARTMENT HEAD: JD Dillard]
RECOMMENDED ACTION: Approve DEPARTMENT: Planning/Zoning DEPARTMENT HEAD: JD Dillard
PDF

[DRAFT AMENDED SECTIONS:]
DRAFT AMENDED SECTIONS:
PDF

[Table 5.04.05. Standards for Provisionally Exempt signs. (continued)]
Table 5.04.05. Standards for Provisionally Exempt signs. (continued)
PDF

[5.04.07 Tables of Sign Standards for Permanent On-Site Signs]
5.04.07 Tables of Sign Standards for Permanent On-Site Signs
PDF

[Table 5.04.07(E)(4). Design Standards for Permanent On-site signs.]
Table 5.04.07(E)(4). Design Standards for Permanent On-site signs.
PDF

[Proposed New Subsection H: (campus signs); Proposed New Subsection I. Residential Development Signage]
Proposed New Subsection H: (campus signs); Proposed New Subsection I. Residential Development Signage
PDF

[4.05.01 Conservation Subdivision (CS); 4.03.11 Vehicle Repair Shops]
4.05.01 Conservation Subdivision (CS); 4.03.11 Vehicle Repair Shops
PDF

[10.00.07 Board of Commissioner Public Hearing Procedures]
10.00.07 Board of Commissioner Public Hearing Procedures
PDF

[10.01.02 Determination of Completeness]
10.01.02 Determination of Completeness
PDF

[10.01.04 Procedures for Action by the Technical Review Committee; 10.02.02 Submittal Requirements for Subdivision Plats]
10.01.04 Procedures for Action by the Technical Review Committee; 10.02.02 Submittal Requirements for Subdivision Plats
PDF

[10.03.00 NOTICE REQUIREMENTS]
10.03.00 NOTICE REQUIREMENTS
PDF

[Planning Division Amendment Notes: Timeline Completed and Planned]
Planning Division Amendment Notes: Timeline Completed and Planned
PDF

March-25-2024-Work-Session-Minutes

[Page 1]
Page 1
PDF

March-26-2024-Regular-Session-Minutes

[Page 1]
Page 1
PDF