Agenda: ULDC text amendments, Loch Winn LTD rezoning, adoption of millage rates, USGS stream gauges, sprayfield expansion, watermain interconnection @ LCC 2024-10-14 [Up]
ULDC text amendments, Loch Winn rezoning, millage rates, river gauges, sprayfield expansion, watermain interconnection: Grove Pointe, Nelson Hill @ LCC 2024-10-14
ULDC, REZ 2024-15 Loch Winn LTD, Millage rates, USGS Stream Gauges
PDF
ULDC Text Amendment TXT-2024-03 includes general amendments to the Code
PDF
to subdivide a portion of the properties into a 41-lot residential subdivision. road frontage on Loch Laurel and Carroll Ulmer
PDF
to subdivide a portion of the properties into a 41-lot residential subdivision. Road frontage on Loch Laurel and Carroll Ulmer; No GLPC review due to lack of quorum.
PDF
The Board of Commissioners is required to set the millage rate for 2024. The county-wide millage for 2024 was advertised at 7.804 mills, requiring advertisement of a tax increase of 6.09% and three public hearings. The rollback millage for 2024 is 7.356 mills. The 2023 millage rate was 8.778.
PDF
The 2024 rate should be set at 2.50 mills which is no change from the prior year.
PDF
$17,000.00 for Little River @ GA 122 and $10,850.00 for Withlacoochee River @ Skipper Bridge. This represents an increase of $3,025.00 over the previous year. precipitation gauge separate line item now
PDF
Currently, we are permitted for two million gallons per day, and Georgia EPD has approved up to three million gallons per day. The additional capacity requires approximately 150 acres of additional fields for spraying.
PDF
Staff recommends installing an 8
PDF
Precipitation, Folsom Bridge Gauge 2024-10-13
Precipitation, Skipper Bridge Gauge 2024-10-13
Nelson Hill & Grove Pointe in VALORGIS 2024-10-13
|